Weekly Hotel
Project H05-05
Weekly Hotel
Project H04-03
Project H04-03 Mid-rise wood building
Characteristics:
Units: 60
Storage areas: 2
Control boards: 61
1. Electric power plant components:
a. Solar panels: 300 (66" x 39", 41 lbs. each)
b. Wind turbines: 200
c. Inverters: 4
d. Electric bank batteries: 4
e. Generac generators: 4
f. Water sprinklers: 16 (on top of the roof)
2. Electric power plant (annual capacity): 150,000 kwh/year
Structure:
3. Prefabricated wood columns with prefabricated wood girders connected with elastic connections
and Simpson connectors.
4. This project was calculated and designed to stand up to any natural phenomena.
5. Total utilized space: 65,000 sq. ft.
Builder price: $50/sq. ft. = $3,250,000. (This price is for Chicago, Illinois.)
[Does not include price of land and price of power plant]
For BRICS countries, Eastern Europe and Africa the price is $30/sq. ft. = $2,000,000.
[Does not include price of land and price of power plant]
George Bundas
Project H04-01
Project H04-01 Weekly Hotel
Characteristics:
Units: 60
Storage areas: 5
1. Electric power plant components:
a. Solar panels: 300 (66" x 39", 41 lbs. each)
b. Wind turbines: 200
c. Inverters: 3
d. Electric bank batteries: 3
e. Generac generators: 3 (60 kwh each)
f. Water sprinklers: 16 (on top of the roof)
2. Electric power plant (annual capacity): 150,000 kwh/year
Structure:
3. Steel tubing columns with wood engineering girders connected with elastic connections.
4. This project was calculated and designed to stand up to any natural phenomena.
5. Total utilized space: 60,000 sq. ft.
Builder price: $50/sq. ft. = $3,000,000. (This price is for Chicago, Illinois.)
[Does not include price of land and price of power plant]
For BRICS countries, Eastern Europe and Africa the price is $30/sq. ft. = $1,800,000.
[Does not include price of land and price of power plant]
George Bundas
Project H04-00
Project H04-00 Weekly Hotel
Characteristics:
Units: 51
Storage areas: 3
Reception, Daycare
and Cafeteria: 1 (2,600 sq. ft.)
1. Electric power plant components:
a. Solar panels: 180 (66" x 39", 41 lbs. each)
b. Wind turbines: 250
c. Inverters: 3
d. Electric bank batteries: 3
e. Generac generators: 3 (60 kwh each)
f. Water sprinklers: 8 (on top of the roof)
2. Electric power plant (annual capacity): 94,000 kwh/year
Structure:
3. Steel tubing columns with wood engineering girders connected with elastic connections.
4. This project was calculated and designed to stand up to any natural phenomena.
5. Total utilized space: 48,000 sq. ft.
Builder price: $50/sq. ft. = $2,400,000. (This price is for Chicago, Illinois.)
[Does not include price of land and price of power plant]
For BRICS countries, Eastern Europe and Africa the price is $30/sq. ft. = $1,440,000.
[Does not include price of land and price of power plant]
George Bundas